                                NO                 | 
                                            
                                PROJECT TITLE                 | 
                                            
                                CLIENT                 | 
                                            
                                START                 | 
                                            
                                COMPLETED                 | 
                                            
                                WORKDONE                 | 
                                            
                                REMARKS                 | 
                                        
                            
                            | 
                                1                 | 
                                            
                                PROJECT KLGCC
  RETICULATION WORK                 | 
                                            
                                SAVE & SAFE
  PLUMBING                  | 
                                            
                                2018                 | 
                                            
                                2019                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                2                 | 
                                            
                                PROJECT
  TERRESTRIAL FIBRE OPTIC CABLING                 | 
                                            
                                HEIWA
  ENGINEERING SDN BHD                 | 
                                            
                                2016                 | 
                                            
                                2017                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                3                 | 
                                            
                                1800MM
  S BEND                 | 
                                            
                                CONDOLINK
  SDN BHD                 | 
                                            
                                2015                 | 
                                            
                                2015                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                4                 | 
                                            
                                100MM
  PIPE REPLACEMENT                 | 
                                            
                                JALUR
  CAHAYA SDN BHD                  | 
                                            
                                2015                 | 
                                            
                                2015                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                5                 | 
                                            
                                1800MM
  MS PIPE REPAIR                 | 
                                            
                                JALUR
  CAHAYA SDN BHD                  | 
                                            
                                2016                 | 
                                            
                                2016                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                6                 | 
                                            
                                PROPOSED
  UPGRADING OF WATER SUPPLY SYSTEM AT LADANG BIKAM LAYBYS                 | 
                                            
                                KEJURUTERAAN
  CEMPERA JAYA SDN BHD                 | 
                                            
                                2017                 | 
                                            
                                2017                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                7                 | 
                                            
                                THE
  CONSTRUCTION & COMPLETION OF MAIN INFRASTRUCTURE WORKS 6 NOS TNB
  SUBSTATION AT PERCIENT OF ELMINA EAST DEVELOPMENT                  | 
                                            
                                ISWARABENA
  SDN BHD                 | 
                                            
                                2019                 | 
                                            
                                2021                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                8                 | 
                                            
                                PIPE
  REPLACEMENT DI DESA BAIDURI                 | 
                                            
                                JALUR
  CAHAYA SDN BHD                  | 
                                            
                                2019                 | 
                                            
                                2019                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                9                 | 
                                            
                                MEMBINA
  JAMBATAN KETIGA KLANG                 | 
                                            
                                CERGAS
  MURNI SDN BHD                 | 
                                            
                                2018                 | 
                                            
                                2020                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                10                 | 
                                            
                                MENAIKTARAF
  LALUAN B49 PERSIARAN MOKHTAR DAHARI DAERAH PETALING,SELANGOR                 | 
                                            
                                PERBUDI
  SDN BHD                 | 
                                            
                                2017                 | 
                                            
                                2020                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                11                 | 
                                            
                                PROJEK
  PENSWASTAAN LEBUHRAYA BERTINGKAT SUNGAI BESI-ULU KELANG (SUKE) SECTION B
  CHERAS TO ULU KELANG (CB3)                  | 
                                            
                                CANTILEVER SDN
  BHD                 | 
                                            
                                2017                 | 
                                            
                                2019                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                12                 | 
                                            
                                PROJEK
  PENSWASTAAN LEBUHRAYA BERTINGKAT SUNGAI BESI-ULU KELANG (SUKE) SECTION B
  CHERAS TO ULU KELANG (CB4)                  | 
                                            
                                CANTILEVER SDN
  BHD                 | 
                                            
                                2018                 | 
                                            
                                2020                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                13                 | 
                                            
                                PENSWASTAAN
  LEBUHRAYA BERTINGKAT DAMANSARA-SHAH ALAM SECTION A- PUNCAK PERDANA TO KOTA
  DAMANSARA                 | 
                                            
                                USAHASAMA
  MONZA LATIMER (UML)                 | 
                                            
                                2018                 | 
                                            
                                2020                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                14                 | 
                                            
                                CONSTRUCTION
  & COMPLETION OF GUIDEWAY, STATIONS,ICONIC BRIDGE PARK & RIDES,
  ANCILLARY BUILDINGS & OTHER ASSOCIATED WORK FOR PACKAGE GS07-08 FOR LIGHT
  RAIL TRANSIT LINE 3 (LRT3) BANDAR UTAMA TO JOHAN SETIA                  | 
                                            
                                GENBINA
  ENGINEERING SDN BHD                 | 
                                            
                                2018                 | 
                                            
                                2020                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                15                 | 
                                            
                                CADANGAN
  PEMBANGUNAN BERCAMPUR YANG MENGANDUNGI PUSAT MEMBELI BELAH, RUANG PEJABAT,
  HOTEL, PUSAT HIBURAN & PANGSAPURI PERKHIDMATAN DI ATAS LOT PT152,
  PT153,PT154,PT155 & PT 156 SEKSYEN 56 DI JLN HANG TUAH/JALAN PUDU,
  WILAYAH  PERSEKUTUAN,KUALA LUMPUR UNTUK
  TETUAN BBCC DEVELOPMENT SDN BHD                 | 
                                            
                                CERGAS
  MURNI SDN BHD                 | 
                                            
                                2018                 | 
                                            
                                2019                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                16                 | 
                                            
                                CADANGAN
  PROJEK PENYURAIAN  TRAFIK &
  KERJA-KERJA MENAIKTARAF JALAN TUN RAZAK (DARI LANGGAK GOLF KE BULATAN KAMPUNG
  PANDAN KUALA LUMPUR (REKA & BINA)                 | 
                                            
                                CANTILEVER
  BUMI  SDN BHD                 | 
                                            
                                2018                 | 
                                            
                                2020                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                17                 | 
                                            
                                KERJA-KERJA
  PEMBAIKAN PAIP UTAMA PECAH BERHAMPIRAN LEBUHRAYA WEST COAST EXPRESSWAY
  BANTING-TAIPING                 | 
                                            
                                PENGURUSAN
  AIR SELANGOR SDN BHD                 | 
                                            
                                2020                 | 
                                            
                                2021                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                18                 | 
                                            
                                CONSTRUCTION
  & COMPLETION OF MAIN INFRASTRUCTURE WORKS AND APPURTENANCE WORKS FOR
  PHASE 3A(1-9 MAIN LINKAGE ROAD) BANDAR BUKIT RAJA STAGE 2, MUKIM KAPAS,
  DISTRICT OF KLANG,SELANGOR DARUL EHSAN FOR MESSRS, SIME DARBY USJ DEVELOPMENT
  SDN BHD ( WATER RETICULATION WORKS)                  | 
                                            
                                ISWARABENA                  | 
                                            
                                2019                 | 
                                            
                                2020                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                19                 | 
                                            
                                CONSTRUCTION
  & COMPLETION OF GUIDEWAY, STATIONS,ICONIC BRIDGE PARK & RIDES,
  ANCILLARY BUILDINGS & OTHER ASSOCIATED WORK FOR PACKAGE GS07-08 FOR LIGHT
  RAIL TRANSIT LINE 3 (LRT3) BANDAR UTAMA TO JOHAN SETIA                  | 
                                            
                                SUNWAY                 | 
                                            
                                2020                 | 
                                            
                                2020                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                20                 | 
                                            
                                UPGRADING
  OF DOWNSTREAM DISTRIBUTION NETWORK TO FACILITATE LANGAT 2 SYSTEM-LANGAT 2
  INTERCONNECTION FOR THE DISTRIBUTION OF 500MLD AT LANGAT BALANCING RESERVOIR                 | 
                                            
                                PENGURUSAN
  AIR SELANGOR SDN BHD                 | 
                                            
                                2020                 | 
                                            
                                2020                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                21                 | 
                                            
                                 PM.20/4793 REPLACEMENT OF 1200MM PIPE
  (FILTERED WATER A NORTH) EMERGENCY WORKS                 | 
                                            
                                SUNGAI
  HARMONI SDN BHD                 | 
                                            
                                2021                 | 
                                            
                                2021                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                22                 | 
                                            
                                PM/20/4793
  EM FLOWMETER REPLACEMENT OF THREE UNITS (3) BSR EM ( ELECTROMAGNETIC)
  "CUSTODY TRANSFER" FLOWMETERS AT MATANG PAGAR RESERVOIR (1800 X 2
  900 mm x 1) -DURING PLANT SCHEDULED SHUTDOWN                 | 
                                            
                                SUNGAI
  HARMONI SDN BHD                 | 
                                            
                                2021                 | 
                                            
                                2021                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                23                 | 
                                            
                                PM/20/4769-
  REPLACEMENT BSR EM-NO 4 B Ma. REPLACEMENT OF THREE UNITS (3) BSR EM
  (ELECTROMAGNETIC)" CUSTODY TRANSFER" FLOWMETERS AT BUKIT MAYONG
  RESERVOIR  ( 1600 LINE NO 4)- DURING
  PLANT SCHEDULED SHUTDOWN                 | 
                                            
                                SUNGAI
  HARMONI SDN BHD                 | 
                                            
                                2021                 | 
                                            
                                2021                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                24                 | 
                                            
                                CONSTRUCTION
  & COMPLETION OF LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA  TO JOHAN SETIA PACKAGE GS09-
  GUIDEWAY,STATIONS, PARK AND RIDE,ANCILLARY BUILDINGS AND OTHER ASSOCIATED
  WORKS                 | 
                                            
                                JAYA
  ZIRA SDN BHD                 | 
                                            
                                Friday,
  15 December, 2017                 | 
                                            
                                Tuesday,
  15 May, 2018                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                25                 | 
                                            
                                CONSTRUCTION
  & COMPLETION OF GUIDEWAY, STATIONS,ICONIC BRIDGE PARK & RIDES, AND
  OTHERS ASSOCIATED WORKS FOR PACKAGE GS06 FOR LIGHT RAIL TRANSIT LINE 3 (LRT3)
  FROM BANDAR UTAMA TO JOHAN SETIA                 | 
                                            
                                CRCC                 | 
                                            
                                Thursday,
  25 July, 2019                 | 
                                            
                                Thursday,
  9 July, 2020                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                26                 | 
                                            
                                CONSTRUCTION
  & COMPLETION OF LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA  TO JOHAN SETIA PACKAGE GS04-
  GUIDEWAY,STATIONS, PARK AND RIDE,ANCILLARY BUILDINGS AND OTHER ASSOCIATED
  WORKS                 | 
                                            
                                GABUNGAN
  STRATEGIK SDN BHD                 | 
                                            
                                Monday,
  4 November, 2019                 | 
                                            
                                Monday,
  20 January, 2020                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                27                 | 
                                            
                                CONSTRUCTION
  & COMPLETION OF GUIDEWAY, STATIONS, ICONIC BRIDGE PARK & RIDES, AND
  OTHER ASSOCIATED WORKS FOR PACKAGE GS05 FOR LIGHT RAIL TRANSIT LINE 3 (LRT3)
  FROM BANDAR UTAMA TO JOHAN SETIA                 | 
                                            
                                CRCC                 | 
                                            
                                Monday,
  20 January, 2020                 | 
                                            
                                Friday,
  20 March, 2020                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                28                 | 
                                            
                                PRIVATISATION
  OF WEST COAST EXPREESWAY (TAIPING-BANTING) SECTION 3-SHAH ALAM EXPRESSWAY
  INTERCHANGE-NKVE/FHR2 INTERCHANGE (PART OF SECTION 3 OF MAIN HIGHWAY WORKS                 | 
                                            
                                WCT                 | 
                                            
                                Tuesday,
  21 January, 2020                 | 
                                            
                                Saturday,
  21 March, 2020                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                29                 | 
                                            
                                CONSTRUCTION
  AND COMPLETION OF GUIDEWAY,STATION,PARK AND RIDE,ANCILLARY BUILDINGS &
  OTHER ASSOCIATED WORK FOR PACKAGE GS10 FOR LIGHT RAIL TRANSIT LINE 3 (LRT3)
  BANDAR UTAMA TO JOHAN SETIA (GS10) ("PROJECT)                 | 
                                            
                                CWM                 | 
                                            
                                Wednesday,
  22 January, 2020                 | 
                                            
                                Sunday,
  22 March, 2020                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                30                 | 
                                            
                                PROPOSED
  PIPE REPLACEMENT PROGRAM IN SELANGOR, WILAYAH PERSEKUTUAN KUALA LUMPUR AND
  PUTRAJAYA YEAR 2020 PACKAGE 42- KUALA LUMPUR                  | 
                                            
                                PENGURUSAN
  AIR SELANGOR SDN BHD                 | 
                                            
                                Thursday,
  23 January, 2020                 | 
                                            
                                Monday,
  23 March, 2020                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                31                 | 
                                            
                                UPGRADING
  OF DOWNSTREAM DISTRIBUTION NETWORK TO FACILITATE LANGAT 2  SYSTEM 
  - LANGAT 2 INTERCONNECTIONS FOR THE DISTRIBUTION OF 500MLD AT LANGAT
  BALANCING RESERVOIR                 | 
                                            
                                PENGURUSAN
  AIR SELANGOR SDN BHD                 | 
                                            
                                Thursday,
  3 September, 2020                 | 
                                            
                                Wednesday,
  23 December, 2020                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                32                 | 
                                            
                                PROJEK
  PENSWASTAAN LEBUHRAYA BERTINGKAT SUNGAI BESI-ULU KELANG PACKAGE CA3                 | 
                                            
                                GABUNGAN
  STRATEGIK SDN BHD                 | 
                                            
                                Monday,
  15 February, 2021                 | 
                                            
                                Wednesday,
  31 March, 2021                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                33                 | 
                                            
                                DISTRIBUTION
  IMPROVEMENT WORKS FOR KUALA LANGAT REGION - PROPOSED INTERCONNECTION FOR
  DISTRIBUTION IMPROVEMENT WORKS AT JENJAROM                 | 
                                            
                                PENGURUSAN
  AIR SELANGOR SDN BHD                 | 
                                            
                                Monday,
  24 May, 2021                 | 
                                            
                                Tuesday,
  31 August, 2021                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                34                 | 
                                            
                                DISTRICT
  METERING ZONE (DMZ) KG.816 PULAU KETAM MP2 & KG.298 TAMAN PARKLANDS                 | 
                                            
                                PENGURUSAN
  AIR SELANGOR SDN BHD                 | 
                                            
                                Monday,
  27 September, 2021                 | 
                                            
                                Saturday,
  13 November, 2021                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                35                 | 
                                            
                                INSTALLATION
  OF PRESSURE REDUCING VALVE (PRV) AND OTHERS. RELATED ACCESSORIES AT TWO (2)
  SELECTIVE LOCATIONS IN SELANGOR DARUL EHSAN                 | 
                                            
                                PENGURUSAN
  AIR SELANGOR SDN BHD                 | 
                                            
                                Monday,
  20 December, 2021                 | 
                                            
                                Tuesday,
  3 May, 2022                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                36                 | 
                                            
                                PROJEK
  LANDASAN KERETAPI DARI SUBANG KE TERMINAL SKYPARK SUBANG FASA 1 (WATER
  RETICULATION WORKS)                  | 
                                            
                                SKYPARK
  LINK SDN BHD                 | 
                                            
                                Monday,
  15 March, 2021                 | 
                                            
                                Monday,
  14 June, 2021                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                37                 | 
                                            
                                PROJEK
  PENSWASTAAN LEBUHRAYA BERTINGKAT DAMANSARA - SHAH ALAM PACKAGE CA4                 | 
                                            
                                SINAR
  WIDURI SDN BHD                 | 
                                            
                                Friday,
  23 July, 2021                 | 
                                            
                                Saturday,
  20 November, 2021                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                38                 | 
                                            
                                PROJEK
  PENSWASTAAN LEBUHRAYA BERTINGKAT DAMANSARA - SHAH ALAM PACKAGE CA4                 | 
                                            
                                GAGASAN
  MAYA SDN BHD                 | 
                                            
                                Thursday,
  23 September, 2021                 | 
                                            
                                Thursday,
  22 September, 2022                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                39                 | 
                                            
                                CADANGAN
  MEMBINA DAN MENYIAPKAN 229 UNIT RUMAH TERES SATU TINGKAT DI FASA 3A DI BATU
  9, JALAN KAPAR PEREPAT, MUKIM KAPAR DAERAH KLANG, SELANGOR                 | 
                                            
                                ATHENEUM
  PARK SDN BHD                 | 
                                            
                                Monday,
  1 November, 2021                 | 
                                            
                                Monday,
  31 October, 2022                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                40                 | 
                                            
                                PROPOSED
  PIPE RETICULATION IMPROVEMENT WORKS IN LABU LANJUT, SEPANG                 | 
                                            
                                PENGURUSAN
  AIR SELANGOR SDN BHD                 | 
                                            
                                Wednesday,
  19 January, 2022                 | 
                                            
                                Wednesday,
  18 January, 2023                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                41                 | 
                                            
                                CONDITIONAL
  ASSESSMENTS, MAINTENANCE CLEANING WORKS FOR WATER SAMPLING STATION FOR
  PENGURUSAN AIR SELANGOR SDN BHD                 | 
                                            
                                PENGURUSAN
  AIR SELANGOR SDN BHD                 | 
                                            
                                Friday,
  1 April, 2022                 | 
                                            
                                Friday,
  31 March, 2023                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                42                 | 
                                            
                                EMERALD
  9 CHERAS                 | 
                                            
                                GLM
  EMERALD SQUARE (CHERAS)                 | 
                                            
                                Wednesday,
  23 November, 2022                 | 
                                            
                                Wednesday,
  22 February, 2023                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                43                 | 
                                            
                                500MM
  S-BEND FOR LRT3 (GS10)                 | 
                                            
                                CWM
  GROUP SDN BHD                 | 
                                            
                                Wednesday,
  8 March, 2023                 | 
                                            
                                Monday,
  26 June, 2023                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 | 
                                        
                            
                            | 
                                44                 | 
                                            
                                300MM
  VALVE REPLACEMENT                 | 
                                            
                                CWM
  GROUP SDN BHD                 | 
                                            
                                Wednesday,
  8 March, 2023                 | 
                                            
                                Friday,
  31 March, 2023                 | 
                                            
                                100%                 | 
                                            
                                COMPLETED                 |